TEMANE – CCGT 450 MW

Energy transition

TEMANE – CCGT 450 MW

The energy transition in Mozambique, led by TSK in 2023-2024, brings forth a key project: the 450 MW TEMANE – CCGT combined cycle. This initiative involves the installation of five SGT-800 gas turbines (60 MW each), by-pass chimneys, heat recovery boilers (HRSGs), and a DST-S10 steam turbine (150 MW). This modernization represents a significant step towards more efficient and sustainable power generation in the region.

  • Client

    TSK

  • Scope:

    Gas Turbine Assembly - 5 x SGT-800 (60MW) - By-pass Chimney - Assembly - Heat Recovery Boiler (HRSG) Assembly - Steam Turbine Assembly 1x - DST-S10 (150MW)

  • Location :

    Mozambique

  • Date:

    2023 - 2024

  • Type of Project:

    Combined Cycle

  • Asset Owner:

    Temane Thermal Power Plant